Week 13 Monday

On Friday of last week Joe came in after another AP test when he should have been in 3rd period. However 3rd period is a disappointing waste of a class so Joe had no problem with coming to engineering  instead. Joe was able to make a sling and he prepared the catapult for testing. The catapult performed very well. Even without maximum cranking of the handles the ball flew very far. Even though the project is considered late at this point we consider this a success due to this being the first functioning torsion catapult at South.

Comments

Popular posts from this blog

about us

Project Proposal

Week 14 Thursday